马来西亚到沙特阿拉伯海运整箱项目货
询盘详情

货物起始地
巴生, 马来西亚货物目的地
吉达, 沙特阿拉伯
寻找代理或供应商
马来西亚
品名
steel structures and electrical gear
装运方式
海运整箱
货物类型
项目货
运费条款
预付
贸易术语
FCA
件重体
70件-其他;每单件:418T、5000CBM
备注
POD : Duba Port, KSA , Jeddah Estimated Departure Time: Next Year 2027 Container size/Weight/Volume: 53x40 ft , total 417.96 Tones (Net) + packing. Requirements: Cargo Details & Assumptions: • Total Volume: 53 x 40ft Containers (COC). • Cargo Type: Industrial steel structures and electrical gear (Non-Hazardous). • Total Weight: 417.96 Tonnes (Net) + packing. • Origin: FCA South East Asia (Please base your budgetary quote on Port Klang, Malaysia or Singapore). • Destination: Duba Port, KSA. • Incoterms: 2020 (Customer to cover all costs from delivery port to final destination). Mandatory Requirements: 1. Transit Time: Estimated transit time (in days) from SE Asia to Duba Port. 2. Validity: How long this budgetary offer is valid (we require 60 days). 3. Exclusions: Clearly state any exclusions (e.g., demurrage, detention, Destination Port
附加服务要求
离港时间
2027-01-01
到港时间
2027-02-24
代报关
需要代报关
联系信息
国家/区域
沙特阿拉伯
联系人
A****
发布时间
2026-11-26
JC Premium
2028-02-17




