JCtrans logo
Company Directory

Company Directory

Access the member directory, company profiles, and online inquiries to unlock multiple business opportunities. Our membership spans 181 countries with 12,000+ paid members and 770,000+ registered users.

View More

Global Inquiries Hotlist

inquiry_ranking_img

It highlights recently active companies, helping users efficiently identify reliable partners.

Solutions
港口详情背景图
国旗

KARATSU

Harbor Type
Coastal (Natural)
Harbor Size
Small
Latitude & Longitude
-
KARATSU Port Schedule Plan more
Port
KARATSU
Routes
Japan-Korea
UN/LOCODE
JPKAR
Country/Region
Japan

Port Introduction

Port on the northwest coast of Kyushu Island, Japan. When using the standard of East 9 district. The maximum draft is 30000 tons. The load density of water is 1025. The tidal range is 1.83 meters. The prevailing southwest wind. Pilot services are available. The communication is carried out using radio very high frequency channels 12 and 16, with the call sign "KARATSU-HO-AN". Working hours are 24 hours. Port service facilities include ship repair, refueling, small motorboats, medical care, towing, fresh water, supplies, repatriation, dry dock and sewage discharge. The port is divided into two parts, with the western part being an active commercial area with a water depth of 7.01-11.89 meters. The anchorage can accommodate more than 100 ships to anchor, including 30 ships with a total tonnage of 5000. 6 Pier Piers: Pier 1-5, with a total length of nearly 490 meters and a water depth ranging from 4.43 to 7.01 meters, can accommodate 4 ships with a total tonnage of 800 and 2 ships with a total tonnage of 3000. OSHIMA Straight Pier, with a length of 220 meters and a water depth of 7.47 meters, can accommodate 2 ships with a total tonnage of 3000. OSHIMA Straight Pier, with a length of 342.9 meters and a water depth of 5.49 meters, can accommodate 4 ships with a total tonnage of 3000. There are also 2 coal loading embankments and a front water depth of 4.88 meters. Three mooring buoys, two of which can accommodate one 1000-2000 gross tonnage ship each, and the other can accommodate one 3000-4000 gross tonnage ship each. There are various electric cranes, electric cultivators, and electric transfer machines on the dock. Good storage facilities, including coal yards. 1 tugboat and 12 barges are available for use. Fuel oil can be added from dock pipelines or barges to provide fresh water and supplies.

Other Port Data

Harbor Use-Shelter AffordedGood
Channel Depth (m)6.4Anchorage Depth (m)9.4
Cargo Pier Depth (m)7.9Oil Terminal Depth (m)11
Entrance Width (m)0Tidal Range (m)2
Maximum Vessel Length (m)0Maximum Vessel Beam (m)0
Maximum Vessel Draft (m)0Facilities - Container-
Facilities - Solid Bulk-Facilities - Liquid Bulk-
Facilities - Ro-Ro-Facilities - Oil Terminal-
Facilities - LNG Terminal-Cranes - Fixed-
Cranes - Mobile-Cranes - Floating-
Pilotage - CompulsoryNoTugs - AssistanceNo
RepairsLimitedDry Dock-
Services - Longshoremen-Supplies - Potable WaterYes
Supplies - Fuel OilYesSupplies - Diesel Oil-
RailwaySmall

Other ports in Japan

View More more
Community
Customer
Opinion Suggestion